Graduate students in my group

I have supervised several generations of master's students at Cambridge, both for the Cavendish Laboratory and the Institute of Astronomy. For both degrees, the research component counts for one third of the year's credits, and results in a publication-style mini-thesis of around ten pages.

Student supervision Gantt chart showing project timelines and milestones - hover to enlarge

Scientific computing

Some degree of scientific computing is required for almost all forms of research. In general, this calls for multiple infrastructure elements to be set up. What follows is a list of the most important elements for increased productivity. The recommendations below are highly personal, but have been stress-tested over many years.

Operating system

You will always find yourself being pushed towards GNU/Linux by performance, compatibility and configurability considerations. It is, however, possible to avoid this for a long time, especially if you use MacOS.

If you do decide to commit to GNU/Linux, it is best to do it early. The Manjaro distribution, with a visual desktop environment such as KDE, offers an easy transition from other operating systems. The typical recommendation is Ubuntu, but Manjaro has the extra advantage of leading naturally to Arch Linux, which is a lean and desirable endpoint. Similarly, KDE gives way naturally to tiling window managers such as i3, which are fully navigable by keyboard and much more efficient in the long run.

Terminal emulator

Within a GNU/Linux system, the central interface is provided by the terminal emulator. Alacritty is a stable, lightweight and configurable choice, but there are many other good options.

The terminal emulator allows you to interact with the shell, which is the command-line interface to the operating system. I’ll assume that you are using the bash shell, though zsh is also popular.

Terminal multiplexer

One shell instance, sitting inside one terminal emulator, is usually not enough. Superficially, a terminal multiplexer such as tmux allows you to have multiple independent shells within one emulator, divided visually into panes or (tab-like) windows. This functionality is basically degenerate with a tiling window manager, but a terminal multiplexer has the essential feature of associating your shells with a persistent server process on your system. You can detach from the server, and re-attach to it later. The terminal emulator thus acts as a portal into your attached sessions: you can usually close the terminal emulator without losing anything.

A good workflow is to maintain a separate tmux session for every project you’re working on, along with a couple of administrative sessions for system maintenance, and so on. It becomes rare to open and use a fresh terminal window without wanting to associate it with a tmux session.

Text editor

Whilst the shell allows you to “do things” with the operating system (i.e. run commands), the text editor allows you to “make things”. A strong choice is Vim, or one of its many variants, such as Neovim. Vim runs in the terminal, seamlessly replacing the shell, and is natively navigable by keyboard. It is very old, very stable and very lightweight.

Besides its applications as a text editor, Vim-like navigation keybindings are also available in many other applications, and can be adopted globally with careful configuration. Keyboard navigation is a major asset for productivity, but also constitutes a significant learning curve, somewhat comparable to touch-typing.

Agentic support

Although they are a very recent addition, agentic coding assistants have completely reshaped the scientific computing landscape. Unlike the other elements in your stack, AI integration is very rapidly evolving, and it is better to say less about it here.

At the time of writing, the main players are Claude Code, and Codex CLI, of which the former is mildly recommended. These platforms are terminal-based, just like Vim.

Typesetting

It would be best to write your report, and your notes, using the REVTeX 4.2e class, which is provided by APS. This will minimise the burden of translating between journal classes, Phys. Rev. D being a reliable choice of journal for a first submission.

Apart from the raw APS template, there is a simple template specific to Part III projects. You can download the sources as .zip or .tar.gz.

Part III Project Template: Open Download

Mobile PDF Preview

Part III Project Template

PDF preview unavailable on mobile. Use the buttons above to open the document.

Open PDF

It is also best to compile locally. You will need a distribution, such as TeX Live, and a compiler, such as latexmk. A standard command would be:

latexmk -pdf -pvc -interaction=nonstopmode Manuscript.tex

Here, the -pdf flag directs to compile to PDF, the -pvc flag tells the compiler to watch for sources writes made by your text editor, and the -interaction=nonstopmode flag tells the compiler to keep going even if it encounters an error. The compiler should be kept running in a companion shell throughout your editing session; it is usually easier to browse the log file for errors than to debug the compiler in interactive mode.

For a document viewer, Zathura is probably the leanest choice:

zathura Manuscript.pdf &

The & escapes the process to the background. Zathura watches the compiled PDF for writes, and automatically reloads it when you compile. It is also possible to direct latexmk to call Zathura for you.

If you prefer a browser, the standard choice is Overleaf. As students, you may be able to get improved service by linking with your CRSID.

Git

Version control is an essential aspect of maintaining a project, and Git is the de facto standard for this. Under Git, the directory containing your project becomes a repository, whose entire state is captured by a history of commits.

Once you’re using Git, you may wish to set up remote copies of your repository that can be shared with others: GitHub and GitLab are third-party services that provide this functionality.

On a mature system, almost every top-level directory will be a Git repository.

Mathematica

You can get a license e.g. here. All Cambridge University students are entitled to a license.

Maple

Maple is another proprietary computer algebra system. There is no University-wide license for this.

xAct

  1. For abstract (and component) tensor and spinor calculus (actually for most physically motivated representations of the Lorentz group), use xAct.
  2. For help with xAct, email me, or try the xAct Group. The latter is actually very responsive, so don’t be afraid to try!
  3. There are some great resources and example code for xAct in this Git repository.

Graph of Matter-Radiation Equality in cosmology. A master's research project in theoretical physics at Cambridge.

  1. Some lessons learned from a notebook that was throwing an error (see right). Firstly, you will almost never need to use TagSetDelayed, as below:

    n /: n[a] n[-a] := -1
    

    Instead, it is better to use MakeRule and AutomaticRules as per:

    AutomaticRules[n,MakeRule[{n[a] n[-a],-1},MetricOn->All,ContractMetrics->True]];
    

    This may seem long-winded, but it is much safer when extending to general indices! Next, the syntax for DefMetric is not quite right. It takes some close attention to the documentation, but you need a tuple to define the pre- and post-fix covariant derivative notation:

    DefMetric[1, \[Gamma][-a, -b], D, {";","D"}, PrintAs -> "\[Gamma]", InducedFrom -> {g, n}]
    
  2. If you define a scalar such as Phi[], i.e. call DefTensor without index specifications, you must still use the empty square brackets whenever you use your scalar in a tensor expression. There may be some rare scenarios where you will wish to refer to the xTensor head directly.
  3. Likewise, covariant derivatives always have the structure CovD_[Indices__]@xTensor_, and you must remember both the indices and the action on some tensor expression (expressed either using @ or []).
  4. A very useful set of tools is provided by the xTras package. This is oriented towards field theory. In particular, if you have a complicated expression and ToCanonical is not properly sweeping up all constant symbols into prefactors of unique tensor terms, you should try the CollectTensors function.
  5. After a time, the question naturally comes as “How can I better format my tensor head?” The route here is provided by the PrintAs option. This function will allow you to effectively parse any string for formatting purposes. Want an accent and superscript on your tensor name? No problem!
DefTensor[NicelyFormattedTensor[-a,b],M4,PrintAs->"\!\(\*SuperscriptBox[OverscriptBox[\(\[ScriptCapitalP]\),\(^\)],\\(\[UpTee]\)]\)"];

Science

Nested Sampling (NS)

  1. Nested Sampling is a numerical integration algorithm whose development has been driven in large part by our group here in Cambridge. Whilst it is a general numerical technique it has become synonymous with calculation of Bayesian evidences. An excellent introduction into what evidences are and why they are interesting can be found in the incomparable textbook on inference by David Mackay inference.org.uk. Two specific chapters to read are 28 - the "why" behind model comparison, and 29 - the "how" numerical evaluation of Bayesian inference takes place. This book predates Nested Sampling, but it is hard to look past Mackay when it comes to introducing the lineage of the technique.
  2. The canonical reference for NS is still the original paper by John Skilling available at projecteuclid.org. Whilst this remains a source of inspiration for the NS developer, a more modern community review article has been compiled recently that is perhaps a better starting point arXiv:2205.15570. This review does a good job of establishing the provenance of the technique in fundamental physics, the pointers towards NS as a partition function calculator is perhaps of most interest to readers of this page.Animated plot of Himmelblau's function for computational physics research at Cambridge University.
  3. Our group has contributed heavily to the technical landscape of NS. MultiNest arXiv:0809.3437 is a pillar of the NS community, often synonymous with the technique itself -- sampling from contracting ellipsoids is pleasingly intuitively geometric -- and for many years was the most complete and popular implementation of NS. PolyChord is the groups current focus in terms of development, being a "next generation" NS algorithm, specifically aiming to push NS to higher dimensional applications than previously considered. The repository of PolyChord git:PolyChordLite is a good starting point with example code to get a hands on sense. NS is nothing without an analysis built on top of it, and the python package anesthetic git:anesthetic is what we use to drive a lot of our work, again the code repository contains some useful starting worked examples.

Modified Newtonian Dynamics (MoND)

  1. Introduction to the specific new relativistic MoND (RMoND) addressed by this project arXiv:2007.00082.
  2. Quite an old study of the spherically-symmetric field equations of a Tensor-Vector-Scalar (TeVeS) theory arXiv:0502122.
  3. McVittie by Kaloper (black holes embedded in FRW spacetimes) arXiv:1003.4777.
  4. Reduced Lagrangia in highly symmetric spacetimes, and dangers of abbreviating the path integral, are discussed in arXiv:1811.10291 and references therein.
  5. Various other recorded talks to be shared by email, with one embedded below.
  1. The MoND project is the only one for which xCoba is likely to be very useful. Unhappily, the xCoba documentation is pretty shaky, and the paucity of knowledge I have about it is mostly patched together from forums and bit-rotted notebooks (credit to those who post and reply!). Below is a sloppy walkthrough of a script which obtains the so-called minisuperspace equations on the cosmological FLRW background, for the CTEG theory. The script itself can be found in the section on cosmological perturbation theory, and you should be able to edit it to investigate the spherically symmetric spacetime relevant to the MoND project.
  1. In this script, you can find some tools for extracting the modified spherically symmetric field equations. In particular you will need to implement a unit-timelike one-form field with spherical symmetry. You can do this with the command:

    DefScalarFunction[A1,PrintAs->"\[CapitalPhi]"];
    DefScalarFunction[A2,PrintAs->"\[CapitalPsi]"];
    AllComponentValues[A[{-a,-SphericalPolar}],{A1[cr[]],B2[cr[]]*Sqrt[A1[cr[]]^2/B1[cr[]]^2-1],0,0}];
    

    You can download a tarball of the sources, or see an embedded pdf below.

Black Hole Equations: Open Download

Mobile PDF Preview

Black Hole Equations

PDF preview unavailable on mobile. Use the buttons above to open the document.

Open PDF

Geometric algebra

  1. For many, many geometric algebra resources, see the GEOMETRY website as maintained by Chris Doran.
  2. For the encoding of Grassmann calculus within geometric algebra, see this quasi-seminal paper.
  3. For the origin of the \(\mathrm{det}(g)^{-1/2}\) on page 16 of that paper, see below.
  4. A determinant calculation in general relativity for a Cambridge Master's theoretical physics project.
  5. How to construct fermions in two Euclidean dimensions? This is an initial target for the lattice implementation of matter fields on dynamical triangulations. There are some indications that once could simply recycle the even sub-algebra formulation of Doran and Lasenby. If one does this, how can the Grassmann formulation be accommodated? For some remarks, see below.
  6. Diagram of two-dimensional fermions for a theoretical astrophysics research project at Cambridge University.
    Gaussian plot from a Cambridge theoretical physics Masters research project in cosmology.
  7. The problem of combining Grassmann-odd variables with the spin structure within one geometric algebra does not actually seem to be so hard. The scalar components can be thought of as inner products of the non-orthonormal Grassmann basis (two basis vectors for each lattice site or node of the dual lattice), with arbitrary vectors \(a\) and \(b\). Care must be taken in constructing the `spin structure part' of the Lagrangian, so that the order of the vectors is reflected in the order of the \((\partial_a\wedge\partial_b)\) prefactor. It should then be possible to extend this setup to non-Gaussian theories via \((\partial_a\wedge\partial_b\wedge\partial_c\wedge ...)\) etc. It may still be possible to recover the Grassmann-odd expressions naturally from the order of operations, but I don't think it can be done if the components are scalars as in the minimal left ideal formulation: since scalars commute with all other grades, their order will be eventually lost whenever bilinear invariants are expanded. Note that the setup to the right is actually simpler than that which I proposed in the meeting on Thursday 2nd February 2023, in that the wedge product does not appear between the spinors.
  8. An especially useful "cheat-sheet" of geometric algebra identities can be found in the file below.
  9. Geometric Algebra Formulae: Open Download

    Mobile PDF Preview

    Geometric Algebra Formulae

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  10. Using Eq. (18) from this document, and the definition of the multivector derivative, we can obtain some further very useful identities.
  11. Equation for a multivector derivative from a Cambridge theoretical physics M.Sc. project with Dr. Will Barker.

Perturbative quantum gravity

  1. Luca Buoninfante's thesis Ghost and singularity free theories of gravity, also 'Xived at arXiv:1610.08744, provides a great pedagogical introduction to the connection between a QFT propagator and the resulting "particle spectrum", and explains why this line of thinking requires a systematic approach (spin-projection operators, SPOs) when the classical field theory contains some d.o.f-rich bosonic fields (commuting tensors with lots of components, as we have in electromagnetism's vector gauge potential \(A^\mu\)). It is slightly unnecessary to use these techniques for QED, but it becomes helpful to use them for gravity whose gauge fields \(h_{\mu\nu}\equiv g_{\mu\nu}-\eta_{\mu\nu}\) produces waves with only two polarisations (not ten). The modified gravity theories in this project have many more than ten d.o.f in their tensor components, so the concept of a "particle spectrum" becomes mandatory.
  2. A fairly old (and well-known) treatment of the particle spectrum of torsion gravity arXiv:1411.5613. This is mostly for context, since it covers a broader category of theories to those addressed in the project (so-called parity-violating). However, the underlying method used by Karananas is the same as the one which we will be using.
  3. Initial application by our group of the SPO method to torsionful theories in arXiv:1812.02675. In principle, the whole methodology we are using for these projects is contained within this paper, but be careful because it is extremely terse!
  4. A follow-up paper to arXiv:1812.02675 is given in arXiv:1910.14197. This paper provides some extra insights into the information which the propagator can provide about renormalisability. For the moment, it should be only of contextual interest: in gravity we take unitarity to have primacy, and renormalisability (which we do not see at first glance in GR) is a bonus.
  5. A final paper in the Yun-Cherng Lin series is found at arXiv:2005.02228. This paper extends beyond torsion gravity into a related set of models comprising Weyl gauge theory (WGT). There is no accommodation in the PSALTer code for WGT, so extensions to this area within the project will be quite speculative.
  6. For more information about WGT and its extensions, see arXiv:1510.06699. This paper is really more for background reading, but it serves as a cross-check on our conventions for the gauge-theoretic formulation of gravity.
  7. Cosmological visualization for a Masters project in Dr. Will Barker's theoretical physics group at Cambridge University.
  8. Speaking of our conventions, we mostly adhere to the setup in Blagojevic's excellent book. For the most part, you won't need anything from beyond the first three chapters. The critical level of understanding, so as to be able to connect with the QFT literature, is as follows. You should be able to expand some Lagrangian \(\mathcal{L}=b\mathcal{L}(A^{ij}_{\ \ \ \mu},h^i_{\ \mu})\), constructed from the Riemann-Cartan and torsion tensors and various other ingredients (such as derivatives), to quadratic order around the vacuum. You should also be satisfied that the whole is invariant under translational and Lorentz-rotational gauge transformations.
  9. A very useful resource which will combine much of the above literature is Yun-Cherng's Ph.D. thesis. The PSALTer code uses very different methods to those described in this implementation (which is a complicated search over root systems), but the background physics will be very useful.
  10. The PSALTer code itself, when a student-friendly version is finished later this term, will be available for download here. For the moment, you can download a Mathematica notebook in which I've performed the particle spectrum analysis.
  11. A Lent-term update to the last item above: a student-friendly version of PSALTer is now ready and functional. However the research programme has since developed into a broader collaboration and in order to protect the IP I'll be moving the source code over from GitHub to GitLab soon. To use PSALTer in the interim, please ask in person. For the moment, you can refer to the output below of the analysis of Einstein-Cartan gravity and general relativity.
  12. Calibration Basic: Open Download

    Mobile PDF Preview

    Calibration Basic

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  13. Another Lent-term update to the last item above: a demonstration for how to install and use PSALTer from a cold start can be found in the video below. Note that this version of PSALTer has been prepared for you with a HiGGS dependency: since the start of your projects I've been working on a way to seaparate HiGGS out entirely so that you should have a highly mutable version to work with (you will be able to introduce user-defined theories, and not just be restricted to the PGT). This new version should be available within the next week or so.
  14. In this next video, we look at the updated version of the PSALTer package, in which the dependency on HiGGS has been entirely stripped out, and functionality included for user-defined classes of theories. For some of you, the final task in your Part III project will be to wrap up your results into one of these theory classes and obtain the relevant particle spectra. To help you out on this quest, I've prepared four essentially unrelated theory classes in the basic source code. These are for the scalar, vector, tensor and full Poincaré gauge theories. As we'll see in this video, these classes allow one to do a tremendous ammount of physics already at the touch of a button.
  15. Having delved into the physical interpretation of the PSALTer output, in this next video we will provide some step-by-step instructions for developing your own theoy class.
  16. Now that you've developed your own theory class, it is time to test it. In this video we will cover `$DiagnosticMode` and the build log, and provide explicit instructions for checking whether your spin-parity decomposition has been done correctly.
  17. Not that it has to do with particle spectra, but someone was interested in accelerated expansion. For those of us that think it has something to do with a cosmological constant, and who are wondering why the value of such a constant is so small, check out the review by Jerome Martin at arXiv:1205.3365.
  18. One of the more recent particle spectrum analyses in the space of metric affine gauge theory (the superset of non-metric, Weyl and Poincaré gauge theories of gravity in which the conncetion is entriely general), this gives a very thorough breakdown of the spin-parity decomposition for the general three-index tensor in four dimensions arXiv:1912.01023.
  19. The initial stages of the particle spectrum analysis assume a momentum-space representation for the Lagrangian, which should be checked when developing `short cuts' for the removal of surface terms. This also connects with the claim that the Lagrangian operator in \(\mathcal{L}=\frac{1}{2}\hat{\zeta}^\text{T}(-k)\hat{\mathcal{O}}(k)\hat{\zeta}(k)\) must be Hermitian.
  20. A Fourier-transformed Lagrangian from a Cambridge graduate student's astrophysics research project.
  21. It is important to check that any nontrivial background around which you are perturbing your Lagrangian is satisfied by the perturbed field equations at lowest order. This is a basic self-consistency requirement. For more on this, see some notes below.
  22. Einstein's field equations for theoretical physics research in general relativity at Cambridge.
  23. After plenty of struggle, we've eventually been able to implement the whole of the metric affine gauge theory of gravity into PSALTer. The main contribution to this particular process comes from Zhiyuan, who performed the mode decomposition of the rank-three four-tensor symmetric in two of its indices. Below is an example calculation for the MAGT in which the Lagrangian contains just the Einstein-Hilbert term. These results can be copied into your report, and particular attention should be paid to the gauge symmetries of the theory, and their relation to the constraints on the source currents.
  24. Metric Affine Gauge Theory: Open Download

    Mobile PDF Preview

    Metric Affine Gauge Theory

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  25. Quite apart from the metric-affine theory, we were also working on extending the particle spectrum method to de Sitter spacetime. Here are some theoretical underpinnings of this analysis.
  26. Curved Fierz-Pauli Analysis: Open Download

    Mobile PDF Preview

    Curved Fierz-Pauli Analysis

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  27. Above we have some expressions that we'll study later in a PSALTer session. The key observation in this script is that the free scalar theory on de Sitter spacetime picks up what looks like a tachyonic mass. This is emphatically not a tachyon, but the fact that it looks like one allows us to smoothly make contact with the saturated propagator and spin-projection particle spectrum method. When we extend to the far more complex case of dynamical gravity on the de Sitter background, our linear Lagrangian becomes fairly obfuscated. It will be our job in the PSALTer session below to show that it actually gives the same spectrum as normal GR, but with the massless pole shifted to precisely the same tachyonic mass as appears in the scalar case.
  28. Finally, here are the results of the PSALTer spectral analysis on de Sitter.
  29. de Sitter Calibration: Open Download

    Mobile PDF Preview

    de Sitter Calibration

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  30. Okay, so this is very interesting. The first observation to make is that the square mass is precisely the same as that which we obtained for the scalar theory, i.e. it suggests the same tachyonic character even down to numerical factors. This is satisfying, and pretty important, because there is a lore that in de Sitter the graviton polarisations both inherit precisely the same mode functions as the free scalar. The remaining task is to show that only two such polarisations are actually propagating. This is quite tricky to achieve using the existing PSALTer setup for the following reason. If we accept that the Hubble scale is acting somewhat like a (tachyonic) mass, then we notice in the above spectrum that only the spin-two parity-even tensor part of the theory is propagating at all (look at the denominator: only that sector has any momentum underneath). Usually we would then say that five d.o.f are moving in the tensor sector (remember how the Wigner little group affects d.o.f for a spin state when you go from massless to massive), so what are we missing? The point is that in the massless case we remember how we need to go over into an explicit coordinate basis and incorporate the source constraints in order to find the massless eigenvalues in the limit of the null cone: I believe we would now have to do the same in the limit of the tachyonic one-sheet hyperbola. Frankly, PSALTer isn't set up to take that new limit (it would require a few weeks' work), but we have a shortcut as follows. It is enough to notice that the four diffeomorphism gauge symmetries of GR survive and flourish in the linear model on de Sitter. Consequently, we know that the whole spectrum above cannot have more than two eigenvalues over the new (apparently tachyonic) pole, because ten take two times four equals two (Google the famous phrase `the gauge always hits twice'). With this observation, the analysis of GR on the de Sitter background is concluded.
  31. One final point to make, in the context of the apparent mass interpretation of the mode functions, is regards Fierz-Pauli tuning. As I mentioned in my calibration script some months ago, one has to be extremely careful in adding mass terms to the Fierz-Pauli model so that only the parity-even spin-two mode becomes massive. Most mass terms one adds covariantly also activate a mode from the scalar sector (Google Boulware-Deser ghost). There is one acceptable mass term, which is called the (tuned) Fierz-Pauli mass term, and which can avoid introducing the a new parity-even spin-zero pole. Astonishingly, the structure of the spin-zero sector in the above de Sitter model bears a striking resemblance to the tuned massive gravity spectrum (please go and compare with my previous calibration script). I'm not sure if this has ever been noticed by other authors, but is certainly worth a comment in your report. It is as if the de Sitter background is playing the role of Fierz-Pauli tuning, so that the mode function pseudo-tachyon does not crop up in the scalar sector.
  32. The following blackboard addresses some bugs that were found in the PSALTer software.
  33. Complex analysis diagram of residues for quantum field theory from Dr. Will Barker's Cambridge graduate research.

Non-perturbative quantum gravity

  1. Tim Budd's excellent online course on Monte Carlo techniques should serve as an introduction to how lattice (Q)FTs are implemented on computers. Not all of the applications are to quantum systems, so be careful! However, there is coverage of criticality which is vital in lattice QFT, and even Euclidean dynamical triangulations (which are intended to be quantum), with some quick-start python implementations of the latter.
  2. Plot of Liouville equation critical points for graduate research in theoretical physics at Cambridge.
  3. The Dynamical Triangulations course, also by Tim Budd, for PITP, gives a far more in-depth introduction to random geometries. For those working with triangulation models, I can strongly recommend watching both of the lectures. There are also some C++ and Mathematica resources from this course: be careful however, since the C++ implementation has some "black box" matter coupled to it, while the Mathematica contains some depreciated syntax. I've fixed the notebook, and if you download it from here then you should be able to make some simple embedding visualisations such as that displayed here.
  4. A punchy "white paper" by Burda, Jurkiewicz and Krzywicki, which sets out a plan for putting fermions on random lattices, can be found at arXiv:9907013.
  5. A paper by the same authors, with much more detail, can be found at arXiv:9905015.
  6. A more in-depth discussion of how to implement fermions and Ising systems coupled to two dimensional gravity can be found in arXiv:0110063.
  7. Massless Majorana-Wilson fermions coupled to quantum gravity in two Euclidean dimensions are studied in arXiv:0107015. I'm happy that this is a standard formulation of EDT.
  8. Massless Majorana-Wilson fermions coupled to quantum gravity in two Lorentzian dimensions are studied in arXiv:0306033. I've not confirmed that this is standard CDT.
  9. A summary of the above two papers can also be found at this Acta. Phys. Polon. B article.
  10. Something to note about the above implementations (and introductions to conformal field theories) is the restriction to fermions which are symmetric under charge conjugation (Majorana spinors). Majorana spinors will be a pain to work with when including gauge symmetries, so can we use Dirac spinors? To investigate this just at the level of holomorphic/antiholomorphic field equations, see below.
  11. The Dirac equation in a Cambridge theoretical physics Masters project with Dr. Will Barker.
  12. A different (and far more recent) branch of the literature in which CDT and some motivated internal gauge symmetries are considered in two dimensions arXiv:2010.15714.
  13. The thorough introduction to CFTs from Champs, Cordes et Phénomènes Critiques can be found at arXiv:9108028.
  14. The conformal algebra in two dimensions has an infinite number of generators. This is quite strange, and indeed when we are doing physics we tend to throw away all the generators which produce singularities at either the north or south pole of the Riemann sphere. In higher dimensions \(d>2\) we obtain a finite algebra simply by looking at infinitessimal coordinate transformations, and the critical observation is that third derivatives of the transformation vector vanish. To recover that result, see below.
  15. Conformal diagram for a Cambridge masters project in theoretical physics, showing spacetime in general relativity.
  16. Tong's lectures on statistical field theory can be found here.
  17. Why restrict to \(N\)-spheres? CDT is implemented on a \(2+1\) torus in arXiv:1305.4702.
  18. Below is a sketch of how to apply the Fujikawa method to the (Euclideanised) Schwinger model in curved spacetime, i.e. a conformally flat 2D manifold. Extra attention is needed in the gauge-fixed bosonic kinetic term, and also the anomalous chiral term. In the latter case, I believe you need to use a Dirac eigenbasis which is valid and orthonormal in the curved spacetime. Then, you also need to use the curved space Dirac operator in the heat kernel regularisation. Without going through all the steps in detail, I suspect the final answer is precisely that which you would get if you insisted on general covariance. That seems natural, but I'm not sure if you would absolutely expect it a priori (since we are in the game of symmetry breaking).
  19. Diagram of the Fujikawa method for chiral anomalies in a Cambridge University theoretical physics research project.

Cosmological perturbation theory

  1. Gauge-theoretic formulation of the torsion condensate arXiv:2003.02690. This is mostly for context, but with fair winds and following seas we might be able to begin to explore perturbation theory directly in the gauge field framework.
  2. Scalar-tensor formulation of torsionful gauge theories, which works at the background level (but how well does it work at the level of perturbations?) arXiv:2006.03581.
  3. Pedagogical introduction to cosmological perturbation theory found in James Fergusson's Part III Cosmology notes.
  4. A slightly more in-depth exploration of perturbation theory, with discussion of extra d.o.f, can be found in the "Helsinki" notes.
  5. A fairly up-to-date review of scalar-tensor theories, for contextual interest, can be found at arXiv:1901.08690. Note that this review covers most of the usual cases of scalar fields which may/may not augment Einstein's theory: the scalar-tensor models in these projects have a unique motivation which is not covered here! That said, Israel Quiros (who is a very interesting researcher) has also worked with torsionful models in the past.
  6. A more principled method for extracting extra scalar d.o.f from torsionful theories, with a cosmological/inflationary application, is presented in arXiv:1904.03545. The main difference here is the guarantee that no extra non-scalar torsion d.o.f are present, which could show up in the perturbation theory.
  7. An attempt to study cosmological perturbation theory using the tetrad and spin connection can be found at arXiv:1601.03943. In this work, the focus is on the scalar and pseudoscalar parts of the torsion tensor which Tsamparlis first demonstrated to be consistent features of the background cosmology, roughly defined as \(h\sim T{^\mu_{\ \ 0\mu}}\) and \(f\sim \epsilon^0_{\ \ \mu\nu\sigma}T{^{\mu\nu\sigma}}\). Accordingly, the analysis performed in this paper is really quite restrictive (and I'm not even sure if it is physically meaningful), but the Lu and Chee approach is at least worth a read.
  8. It appears that the most concerted (and most recent) work on the cosmological perturbation theory of torsionful gravity has been through the lens of the teleparallel theory. In teleparallel theory, the gravitational Lagrangian density is \(\mathcal{L}=\frac{1}{2}M_{\text{Pl}}^2\mathbb{T}\) where \(\mathbb{T}=\frac{1}{4}T_{ijk}T^{ijk}+\frac{1}{2}T_{ijk}T^{jik}-T^{i}_{\ \ ji}T_{k}^{\ \ jk}\) is a specific combination of quadratic torsion invariants. For teleparallel gravity (and the natural extension to \(f(\mathbb{T})\) gravity) to function like GR, there are some nuanced conditions that have to be applied to the spin connection. It is within the context of these conditions that the cosmological perturbation theory has been explored in papers such as arXiv:1911.06064, arXiv:2001.10015 and arXiv:2110.12332. These were skimmed from a half-hour on the arXiv, so I would strongly recommend you make a very thorough literature review of possible approaches to the SVT decomposition in the gauge-theoretic formulation: other authors may have devised some really neat tricks that could save you time!
  9. When your code starts to become successful, you will want to implement background values of the scalar fields \(\phi\) and \(\psi\) which are commensurate with known exact solutions to the cosmological field equations of a given theory. Depending on your project abstract, you might be looking into different theories, but the candidate of most interest to our group is the constant torsion emergent gravity (CTEG), in which the pseudoscalar torsion \(\psi\) adopts a constant background value: the torsion condensate or correspondence solution. Whilst the value of the condensate is well known, as far as I can recall none of the papers on CTEG actually quote the value of \(\phi\) on the background. It turns out after a computation that \(\phi\propto H\) as the Universe evolves with Hubble number \(H\), but that the constant of proportionality varies depending on which kind of matter is dominating the cosmic fluid. To show this, and for inspiration to those who are working on exact solutions to other modified gravity theories (I'm thinking of MoND here!), there is prepared a short Wolfram script with .pdf output below. You can also download a .tar.gz of the source.
  10. Torsion Condensate Analysis: Open Download

    Mobile PDF Preview

    Torsion Condensate Analysis

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  11. In tandem with the Wolfram script above, some parts of the calculation are easiest done by hand. These are shown below, and at the end in the red boxes you can see a summary of the background solutions for the CTEG.
  12. Torsion condensate visualization from Dr. Will Barker's theoretical physics research group at Cambridge.
  13. For those students who are working with the full mechanics of the Poincaré gauge theory on the background of an expanding spacetime, the Ricci rotation coefficients \(\Delta^{ij}_{\ \ \ \mu}\) will be needed. They are not necessary if you are working with the scalar tensor analogue theory. If you are using them, it is important to correctly interpret the valences and tangent spaces associated with the different slots, because both raising/lowering and exchanging of Greek/Roman indices become nontrivial operations at zeroth order on the expanding background. The following notes may be of use not only for the cosmological perturbation theory, but also for the particle spectrum.
  14. Ricci Rotation Coefficients in a general relativity project supervised by Dr. Will Barker at Cambridge.
  15. The initial step in the development of a cosmological perturbation theory is the identification of the gauge-invariant modes. First the gauge fields are set out, then they are perturbed around the FLRW background. Next, infinitesimal gauge transformations are taken and the perturbed, gauge-transformed gauge fields are decomposed according to the SVT formalism. Among the decomposed fields, it is possible to notice how all the SVT modes themselves transform. Equipped with this knowledge, combinations of the SVT modes are concocted which are gauge invariant, their inhomogeneous transformation terms cancelling internally. To see a great example of this working in practice, check out arXiv:2011.02491, as written by a true master in the field. The process is well described for the teleparallel model (see above) over sections 5.2 and 5.3 within that paper. To get some inspiration on how to do this for the case of vector-only torsion, see the notes below.
  16. Diagram from a Cambridge theoretical physics project on rotational perturbation theory.
  17. The next question comes as "Why are we using vector-only torsion?" This is quite a delicate question, and the short answer is "Because full torsion is probably too complicated for a Part III project!" Even within the context of vectors, we have further restricted to the scalar modes from the SVT decomposition, as the simplest possible baby-case of the theory. To conclude that this is a gross over-simplification of the physics is probably valid for the particular model at hand: this project was advertised as being for the analysis of the CTEG theory, in which no modes are assumed to be deactivated for any reason. However, there are some quite profound motivations for restricting to vector and axial vector parts of the torsion in the context of other theories. Consider the draft below (this is not yet published, so you can recycle parts of the introduction into your reports without needing to cite at this stage). When the tensor part of the torsion is present, it causes the vector and axial vector parts to propagate as a combined, strongly-coupled Kalb--Ramond field (a two-form field better known from string theory). This strong coupling is unacceptable, and it can be alleviated (in this specific scenario) by killing off the tensor part of the torsion with a multiplier field.
  18. Vectors Manuscript: Open Download

    Mobile PDF Preview

    Vectors Manuscript

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  19. Some sketch of the process for recovering the Bardeen potentials from the (enhanced) scalar perturbation modes of the tetrad field can be found below.
  20. Theoretical physics diagram of quantum perturbation theory for a Cambridge University masters research project.
  21. Here are the field equations. The initial equations are those of a curious torsion theory in which the Einstein-Hilbert Lagrangian is augmented with the square of the antisymmetric part of the Riemann-Cartan-Ricci tensor. In this case, we might reasonably expect that there is propagating torsion, but in fact we do not find any new degrees of freedom. It would be good to confirm this state of affairs using the cosmological perturbation theory! You can download a tarball of the sources.
  22. Marcos Field Equations: Open Download

    Mobile PDF Preview

    Marcos Field Equations

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  23. There is some question surrounding the nature of the scalar mode in the spin-2 parity-odd sector of the connection field. This mode has (to the best of my knowledge) never been treated with the SVT decomposition method. However, a quarter-hour of tinkering suggests that it is not too hard to obtain. Please double-check my results. You can download a tarball of the sources, or see an embedded pdf below.
  24. Parity Odd Spin Two Scalar: Open Download

    Mobile PDF Preview

    Parity Odd Spin Two Scalar

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

  25. Here is the short video discussion regarding the 2-form field which carries all the dynamics of the strongly coupled modified gravity theory.
  26. And here is an embedded pdf of the same file.
  27. Most Important Analysis: Open Download

    Mobile PDF Preview

    Most Important Analysis

    PDF preview unavailable on mobile. Use the buttons above to open the document.

    Open PDF

Logistics

Below is some logistical information about the structure of research projects, including relevant deadlines. Much of this is transplanted from the various departmental websites (which you should check regularly for updates), but in places where I have my own deadlines/ammendments I will indicate in bold, underlined and italic script.

Quasi-regular Friday meetings

Research group meetings for (confirmed) new members, and members who joined as summer students in recent months, will be held in slots from 09:00-14:30 on Fridays (with later slots for those who really can't make the morning). These will be in-person by default, but a Zoom room will be open during that period. Book these below.

Note that whilst both astrophysicists and physicists are expected to focus more on projects during Lent term, the degree to which I can expand my calendar to match will be very limited. Therefore, I'd strongly advise that we make the most of meetings during Michaelmas.

M.Sci. and M.Ast. for Part III Astrophysics

Michaelmas Term

An electronic PDF copy interim progress report, length no more than 1,000 words, bearing the signature(s) of the main supervisor(s) and second supervisor, must be uploaded to the Part III/MASt Astrophysics Moodle site no later than 12:00 Friday 2nd December 2022 (the last day of Michaelmas Full Term). The report should be produced with LaTeX, or an equivalent text-processing package and may contain material that can be incorporated in the final project report. The interim report must indicate the progress made so far and show preliminary results. It should also give a clear indication of the project aims and a detailed plan of how these aims will be achieved. This is particularly important where the results of the project depend on data that has yet to be analysed. There is no need for the interim report to reiterate the material given in the Project Handbook. The interim reports do not constitute part of the formal assessment but are regarded as an essential part of the monitoring procedure. The Course Coordinator will assess these reports and provide feedback to students and supervisors.

Lent Term

Practice oral presentations, consisting of a 20-minute talk followed by up to 10 minutes of questions, to an audience of Part III Astrophysics students, Project Supervisors and the Project Coordinator will be given on the last Tuesday, Wednesday, Thursday, and Friday of Lent Term (14th, 15th, 16th and 17th March 2023). A final timetable for the presentations will be provided by e-mail during the previous week. This practice presentation is not formally assessed but offers the opportunity to become familiar with the format of the presentation, to be assessed by the Part III Examiners in the Easter Term. Students are encouraged to attend the practice talks of their peers which will help strengthen their presentation techniques.

Easter Term

A draft of the final project report, generated with LaTeX or an equivalent text-processing package, should be handed to the Project Supervisor no later than Monday 24th April 2023. The last Supervision, to discuss the draft report, should take place no later than Monday 1st May 2023.

I will not be available on Monday 1st, so our final supervisions will be our usual meeting slots on Friday 28th April.

An electronic PDF copy of the final project report must be uploaded to the Part III/MASt Astrophysics Moodle site no later than 12:00 BST Monday 8th May 2023. Late submissions are very strongly discouraged because you will be left with insufficient time to properly revise for the written examinations. In circumstances in which it is unavoidable you must seek permission in advance and then any late submissions must be submitted via your college Tutor with an accompanying letter of explanation from the Tutor. Your University Examination Number must NOT appear anywhere in the report or on the cover sheet.

Register interest

The projects which were advertised can be found in the IoA project booklet.

The IoA has provided the results of their student allocation algorithm. All projects are now allocated.

M.Sci. and MASt for Part III Physics

To see a list of abstracts on offer, go to the Teaching Information System.

In response to popular demand, one new project was added, to be co-supervised by Dr. Amel Durakovic.

Progress reports

Students will be asked to complete two progress reports. At the end of the Michaelmas Term, you must submit an Initial Report (one copy; between 4 and 6 A4 pages in length). This Initial Report should describe the project in your own words, putting the physics into context (including references to the relevant literature) and describing the goals of the project; it must also include a project plan. This report should be electronically signed by both you and your supervisor to indicate his or her agreement with the plan and should be uploaded onto the TIS by Friday 2 December 2022 by the student. A copy of the Initial Report will be retained by the Undergraduate Office and forwarded to the assessor in Easter Term – failure to submit an Initial Report will result in the loss of 5% of the available project marks.

The second report is a simple "tick box" form, which can be downloaded from the TIS during week three of the Lent term. This will invite you to report any problems with your project, and to confirm that a presentation has been scheduled. The form should be uploaded to the TIS by Wednesday 8 February 2023. The second report will not form part of any assessment but will allow any problems to be identified by Professor Hirst well before the time the project has to be handed in.

It is very important that students bring any unforeseen delays or other problems with their projects to Professor Hirst’s attention at the earliest possible opportunity. The earlier such problems are addressed, the more chance there is of taking suitable remedial action.

The project write-up

The project should usually be presented in the style of a paper published in a scientific journal. The main text (excluding appendices and abstract) should be concise (20–30 pages, 5000 words maximum (excluding references)). The text should describe and explain the main features of the project, the methods used, results, discussion and conclusions, and should be properly referenced. Detailed measurement records, calculations, programs, etc. should be included as appendices. In addition, there must be an abstract of at most 500 words.

This final write-up is an important part of the project and must be the student's own work. A lecture on Project report writing will be given on Tuesday 24 January 2023 at 4:00pm in the Small Lecture Theatre. Once the majority of the research work has been completed, the student and supervisor should discuss the general structure and content of the report before writing is started. Thereafter, the student must write the final report without advice on the report from the supervisor, although discussion of the scientific results is allowed during this period. A set of handy tips and information is given in the booklet entitled Keeping Laboratory Notes and Writing Formal Reports.

Submission of the project

The deadline for submission of the project is:

4:00 pm on the third Monday of Easter Full Term (15 May 2023)

A request for a delay in the hand-in date of your project report due to illness must go through your Director of Studies and then be agreed by the Applications Committee. Treat this deadline like you would an exam date.

The project report should be submitted as a pdf file to the TIS before the submission deadline. A link to your on-line notebook should also be added to the first page of your report before uploading the project.

To preserve anonymity when your project is looked at by the Part III examiners, your name must not appear on the project report itself. You should ensure that your candidate number appears on the first page of your project, together with the title of the project and your supervisor’s name.

Your project report should contain the following statement on the first page of the project: Except where specific reference is made to the work of others, this work is original and has not been already submitted either wholly or in part to satisfy any degree requirement at this or any other university.

Register interest

To apply to a project, please email me a copy of your CV, with some indication of your undergraduate exam record, and book a slot to discuss from the appointments below (you don't need to be "invited" to meet, just turn up!):

Initial allocations were made on Friday 14th and Sunday 16th October. Final allocations were made on Tuesday 18th October. All projects are now allocated.